Safety on site
Groundworks is the highest-risk stage of most projects — deep excavations, live services, heavy plant and concrete all happening in the same footprint. Rayco Civils manages that with qualified operatives, written method statements, insured works and plant that is checked before it is used.
Site operatives hold Safe Pass, and machine operators hold CSCS cards for the plant they run. Nobody works a machine they are not carded for.
Risk Assessments and Method Statements are prepared for the activities on each site — excavation, lifting, concrete pours, working near services — and issued before work starts.
Public Liability and Employer's Liability insurance is in place. Certificates are supplied to clients and main contractors on request.
Service drawings are reviewed, routes scanned and hand-dug where needed. Excavation edges are protected, spoil set back, and deeper trenches battered or supported before entry.
Machines are checked before use, defects reported and dealt with, and plant is kept serviced so it is safe and reliable on site.
On main-contractor sites we work to the site-specific safety plan, attend inductions and briefings, and issue documentation into the contractor's system.
Yes. Operatives hold Safe Pass, and plant operators hold the relevant CSCS cards for the machines they work.
Yes. Works are delivered under Risk Assessments and Method Statements covering the activities on that site, issued before work begins.
Yes. Rayco Civils carries Public Liability and Employer's Liability insurance. Current certificates can be supplied to clients and main contractors on request.
Excavations are planned around ground conditions and service locations: services are scanned and hand-dug where required, edges are protected, spoil is set back from the excavation, and deeper trenches are battered or supported before anyone enters.
Additional accreditation documentation: to be completed by Rayco Civils.