
Roadworks and kerbing for housing estates, access roads and commercial developments. We construct sub-base, install kerbing and footpath edging, and prepare road formations ready for binder and wearing course.
Road construction builds up in layers: the formation is excavated and proof-rolled, a capping or sub-base is placed and compacted to the specified thickness, kerbs are set to line and level, and the surface is then prepared for binder and wearing course. Rayco Civils constructs estate roads, access roads and commercial roadways across Ireland.
Typically a prepared formation, a capping layer where the subgrade is weak, a compacted granular sub-base, then bituminous binder and wearing courses. Layer thicknesses come from the road design and the ground conditions.
We construct the road to sub-base and kerb level and prepare it for surfacing, and co-ordinate with the surfacing contractor for the binder and wearing course.
Roads intended for taking in charge must be built to the local authority's standard for construction, drainage, kerbing, footpaths and services. Build to the approved drawings and specification, and keep the records the authority will ask for.
Yes. Surface-water gullies, connections and manholes are installed as part of the roadworks package and tied into the storm drainage system.
We deliver roadworks packages across every county in Ireland. Tap your county for local detail.
Jump straight to your service, county, or the exact combination you need.
Free, no-obligation roadworks quote — anywhere in Ireland. Call us or send your drawings.