
A civils and drainage contractor installs the buried infrastructure on a development: foul and storm networks, manholes and gullies, attenuation and soakaways, land drainage and utility ducting — excavated to the design invert levels, bedded, jointed, tested and recorded as-built.
Drainage is the part of the civils package with the least tolerance for approximation. Pipes work on fall, and a run laid to the wrong invert cannot be corrected by anything downstream of it.
Rayco Civils installs complete foul, storm and surface water systems alongside the wider civils package, so drainage, ducting and earthworks are sequenced by one contractor instead of being handed between trades in open ground.
Rayco Civils is a civil engineering and groundworks contractor based in Monamolin, Co. Wexford, working on sites across Ireland. Send drawings or a site location and we will price the works.
Trenches are excavated to the invert levels on the drainage layout, pipes bedded on granular material, jointed correctly and surrounded before backfill. Falls are checked before anything is covered, because the alternative is excavating a finished surface to find a flat run.
Manhole and chamber positions and cover levels are set from the same drawing, so the finished network matches what will be certified rather than what happened to fit on the day.
Most Irish sites now carry a restricted discharge rate, so storm water is held on site in attenuation tanks, oversized pipes or soakaways and released through a flow control. These are installed as part of the drainage package with the invert and cover levels the design requires.
Systems are air or water tested and, where required, CCTV surveyed, and the results are recorded with the as-built layout. That record is what allows the drainage to be signed off and what a purchaser's engineer will ask for later.
Yes — separate foul and storm networks, plus surface water interception, attenuation, soakaways and land drainage, installed to the drainage layout and invert levels provided.
Yes. ESB, telecoms, gas and water ducting is installed alongside drainage, often in shared trenches, so ground is opened once and reinstated once.
Yes. Air or water testing is carried out and, where specified, CCTV survey, with results recorded alongside the as-built drainage layout for certification.
Yes. New connections into existing foul, storm and public systems are made and rebuilt to the same standard as new installations, with the surface reinstated afterwards.
Jump straight to your service, county, or the exact combination you need.
Send your drawings or site location for a free, no-obligation quotation anywhere in Ireland.