
Industrial groundworks prepares factory, warehouse and industrial-park sites: bulk earthworks to a level platform, pad and strip foundations for portal frames, reinforced floor slabs, HGV yards, drainage with interceptors, and utility ducting.
Industrial sites are dominated by two things: floor loading inside and vehicle loading outside. Both are decided by the ground works below them.
Rayco Civils is a civil engineering and groundworks contractor based in Monamolin, Co. Wexford, working on sites across Ireland. Send drawings or a site location and we will price the works.
Large industrial footprints magnify small level errors. Formation is surveyed across the platform, fill is placed and compacted in controlled layers, and soft spots are excavated and replaced before slab works begin.
Balancing cut and fill on site, where the material is suitable, keeps import and disposal volumes down on schemes where those volumes are significant.
Portal frame buildings concentrate load into pad bases with holding-down bolts that must be positioned accurately. Setting out, bolt templates and levels are checked before pouring because steel erection has no tolerance for drift.
Service yards take repeated heavy turning movements. Build-ups, kerb restraint, drainage falls and gully positions are set for that duty rather than for light traffic, and surface water is directed away from dock levellers and door thresholds.
Yes — sub-base preparation, reinforcement, pour and joint layout are carried out to the structural engineer's specification.
Yes, where the drainage design requires an interceptor it is installed and connected as part of the storm drainage works.
Jump straight to your service, county, or the exact combination you need.
Send your drawings or site location for a free, no-obligation quotation anywhere in Ireland.