Solar · Substations · Cable routes · Access tracks

Civil Works for Renewable Energy & Utilities

Energy and utility projects live or die on their civil works: if the access track will not carry the delivery, or the cable route is not trenched to programme, nothing else on site can proceed.

Rayco Civils delivers access tracks, hardstands, trenching, ducting and concrete bases for renewable energy, substation and utility infrastructure projects across Ireland.

What we deliver

Site access tracks and construction hardstands
Cable trenching, ducting, draw pits and jointing bays
Substation, inverter and transformer bases
Foundations and ballast bases for solar and equipment structures
Drainage, culverts and watercourse crossings
Site clearance, fencing lines and reinstatement

How we approach renewable energy & utilities projects

Access before everything

Track construction is sized for the heaviest delivery the project will see, including crane and transformer movements, and built early so the programme is never access-limited.

Trenching to specification and record

Cable trenches are excavated to depth, bedded, backfilled with the specified surround, marker-taped and recorded on as-built drawings for future safe working.

Environmental constraints

Watercourse crossings, silt control and peat handling are planned with the project ecologist and to the conditions attached to consent.

FAQs

Do you carry out cable trenching and ducting?+

Yes — trenching, ducting, draw pits, backfill to specification and full as-built records.

Can you build access tracks over soft ground?+

Yes, using geotextile and geogrid separation with engineered stone build-up sized to the loads and ground conditions.

Arrange a Site Visit

Send drawings or arrange a site visit and we'll price your civil works package.